The Elevator Installation and Maintenance Course aims to establish the provisions applicable to the installation, assembly, disassembly, operation, testing, and repairs in elevators for vertical transport of materials and people on construction sites or work fronts.
What is Elevator Maintenance?
Elevator maintenance is an extremely important service and requires a high level of technical responsibility, as this work aims to guarantee a smooth operation in the work and safety for those involved.
Click on the Link: Criteria for Issuing Certificates in accordance with the Norms
- Certificado
- Course Load: 40 Hours
- Prerequisite: Literacy
MODALIDADES
ASSÍNCRONAS E SÍNCRONAS
1. EAD - APOSTILA INTERATIVA
1. EAD - APOSTILA INTERATIVA
2. EAD - AUDIOVISUAL (VIDEOAULA)
2. EAD - AUDIOVISUAL (VIDEOAULA)
3. EAD - TRANSMISSÃO AO VIVO
3. EAD - TRANSMISSÃO AO VIVO
Não perca tempo, solicite SUA proposta agora mesmo!
Elevator Installation and Maintenance Course
Application field;
Responsibilities;
Safety signs;
Risk Management Program (PGR);
Living areas;
Electrical installations;
Work stages;
Machines, equipment and tools;
Moving and transporting materials and people (elevators);
List of significant risks;
Distance between the cab door and the inner surface of the box and the distance between the cab door and the floor door:
Elevator machine;
Electromechanical brake;
Emergency operation;
Machine stop and verification of its stop condition;
Operation time limiter;
Box:
Closing the box;
Inspection doors and emergency doors for the box and access to the well;
Box walls;
Protection of any accessible spaces located under the car or counterweight;
Balance protection part;
Protective partition on the box;
Clearances at the last height and in the well;
Access to the well;
Stop device in pit and pulley house;
Box lighting;
Emergency escape for people working in the box;
Engine room and pulley room:
Access to engine room and pulley room;
Engine room and pulley room floors;
Machinery clearances;
Engine room floor levels and recesses;
Lighting in engine room and pulley room;
Equipment handling;
Floor doors and cabin doors:
Floor doors and cabin doors not perforated;
Floor door fixings;
Use of glass in cabin doors and deck doors;
Cab and floor doors of the horizontal sliding type of glass;
Floor lighting;
Cab doors and automatic horizontal sliding-type floor doors impact protection;
Locking devices;
Unlocking floor doors;
Autonomous closing of pavement doors;
Multi-leaf horizontal sliding type doors;
Behavior of deck doors under fire conditions;
Vertical axis type deck doors combined with electrically operated horizontal sliding cabin doors;
Cab doors and/or pantographic floor doors;
Warnings: markings and operating instructions:
Verification of security measures and/or protection devices;
Information for use;
Suspension protection, compensation and overspeed:
Protection for drive pulleys. deflection pulleys and sprockets;
Safety brake and speed limiter;
Speed limiter cable tensioning device;
Car overspeed in upward motion and uncontrolled car movement with the doors open;
Guides, bumpers and final route limiters:
Cable guided counterweight;
bumpers;
Final course limiters;
Electrical installations and electrical appliances:
Protection against electric shock;
Electrical protection of elevator machinery motors;
Main switches;
Protection against electrical failures, controls and priorities:
Phase inversion protection;
Inspection operation control pushbutton and stopping device;
Emergency alarm device;
Communication between the cabin. engine room and building entrance;
Load control;
Security requirements and/or protective measures:
General;
Accessibility requirements;
Leveling and stopping accuracy;
Vandalism requirements;
Behavior of elevators in case of fire;
Car and balance:
Cabin useful area, nominal load and number of passengers;
Prevention of the risk of people falling into the box (platform protector);
Cab without a door;
Locking of hatches and emergency doors in the cabin;
Cab roof resistance and emergency hatch;
Cab roof protection;
Cab ventilation;
Emergency lighting and in-cab lighting.
Activity Complements:
Awareness of Importance:
APR (Preliminary Risk Analysis);
PAE (Emergency Action Plan;
PGR (Risk Management Plan);
Understanding the need for the Rescue Team;
The importance of knowledge of the task;
Accident prevention and first aid notions;
Fire protection;
Perception of risks and factors that affect people’s perceptions;
Impact and behavioral factors on safety;
Fear factor;
How to find the fastest and easiest way to develop Skills;
How to control the mind while working;
How to administer and manage working time;
Why balance energy during activity in order to obtain productivity;
Consequences of Habituation of Risk;
Work accident causes;
Notions about the Tree of Causes;
Notions about Fault Tree;
Understanding Ergonomics;
Job Analysis;
Ergonomic Hazards;
Hazard Communication Standard (HCS) – OSHA;
Practical exercises:
Registration of Evidence;
Theoretical and Practical Assessment;
Certificate of participation.
Requirements to teach practical part Machine or Equipment maintenance training
Machine or Equipment completely mechanically dismantled;
Engine on bench fully disassembled including clutch system;
Tools for assembling and disassembling engines and mechanical, cooling and clutch parts;
Minimum knowledge of mechanics and electrical;
Lubricating oil for engine and hydraulic fluid for clutch as well as fluid for cooling system;
Technical Instruction Manual for the engine of the machine or equipment;
Technical Instruction Manual for Machine or Equipment Maintenance;
The Equipment must be without wheels, or rotating material (mat) supported on an easel;
The final test will be applied at the end of the training;
The Theoretical Assessment will be applied at the end of the theoretical studies by the EAD Platform.
Procedures: Only when Practical Maintenance Training is contracted:
The training must be accompanied by the Supervisor of the maintenance area as a courtesy student, including his final test as well as the others.
The student will not be allowed to leave the training session under any circumstances.
The practical training time will be after theoretical training reviews and final tests.
Our Multidisciplinary Team is entitled to insert the standards, laws, decrees or technical parameters that they deem applicable, whether related or not to the scope of service negotiated, with the Contracting Party being responsible for providing the necessary services in accordance with the legislation, as established in them.
Elevator Installation and Maintenance Course
Elevator Installation and Maintenance Course
Normative references when applicable to applicable devices and their updates:
NR 01 – Disposições Gerais e Gerenciamento de Riscos Ocupacionais – (General Provisions and Occupational Risk Management);
NR 11 – Transporte, Movimentação, Armazenagem e Manuseio de Materiais – (Transport, Handling, Storage and Handling of Materials);
NR 12 – Segurança no Trabalho em Máquinas e Equipamentos – (Safety at Work in Machinery and Equipment);
NR 18 – Segurança e Saúde no Trabalho na Industria da Construção – (Occupational Health and Safety in the Construction Industry);
NBR 15597 – Requisitos de segurança para a construção e instalação de elevadores – Elevadores existentes – Requisitos para melhoria da segurança dos elevadores elétricos de passageiros e elevadores elétricos de passageiros e cargas – (Safety requirements for the construction and installation of elevators – Existing elevators – Requirements for improving the safety of electric passenger elevators and electric passenger and cargo elevators);
NBR 16200 – Elevadores de canteiros de obras para pessoas e materiais com cabina guiada verticalmente – Requisitos de segurança para construção e instalação – (Construction site elevators for people and materials with a vertically guided cabin – Safety requirements for construction and installation);
NBR 16756 – Requisitos de segurança para construção e instalação de elevadores – Alarme remoto em elevadores de passageiros e elevadores de passageiros e carga – (Security requirements for construction and installation of elevators – Remote alarm in passenger elevators and passenger and cargo elevators);
ABNT NBR 16746 – Segurança de máquinas – Manual de Instruções – Princípios gerais de elaboração – (Machine safety – Instruction Manual – General elaboration principles)
ABNT NBR 13759 – Segurança de máquinas – Equipamentos de parada de emergência – Aspectos funcionais – Princípios para projeto – (Machine safety – Emergency stop equipment – Functional aspects – Design principles);
ABNT NBR ISO 14121-2 – Segurança de máquinas – Apreciação de riscos – (Machine safety – Risk assessment);
ABNT NBR 16489 – Sistemas e equipamentos de proteção individual para trabalhos em altura – Recomendações e orientações para seleção, uso e manutenção – (Individual protection systems and equipment for work at heights – Recommendations and guidelines for selection, use and maintenance);
ABNT NBR 16710-2 Resgate Técnico Industrial em Altura e/ou em Espaço Confinado – Parte 2 Requisitos para provedores de Treinamento e Instrutores para qualificação Profissional – (Industrial Technical Rescue at Height and/or Confined Space – Part 2 Requirements for Training Providers and Instructors for Professional qualification);
Protocolo – Guidelines American Heart Association;
ISO 10015 – Gestão da qualidade – Diretrizes para treinamento – (Quality management – Training guidelines);
ISO 45001 – Sistemas de gestão de saúde e segurança ocupacional – Requisitos com orientação para uso – (Occupational health and safety management systems – Requirements with guidance for use):
Note: This Service exclusively meets the requirements of the MTE (Ministry of Labor and Employment) when dealing with other bodies, inform in the act of request.
Elevator Installation and Maintenance Course
Elevator Installation and Maintenance Course
Inexperienced Participants:
Minimum credit hours = 80 hours/class
Experienced Participants:
Minimum credit hours = 40 hours/class
Update (Recycling):
Minimum credit hours = 16 hours/class
Updating (Recycling): The employer must conduct periodic training Annually and whenever any of the following situations occur:
a) change in work procedures, conditions or operations;
b) event that indicates the need for new training;
c) return from work leave for a period exceeding ninety days;
d) change of company;
e) Exchange of machine or equipment.
Elevator Installation and Maintenance Course
Elevator Installation and Maintenance Course
Our pedagogical project follows the guidelines imposed by Regulatory Standard nº1.
After payment is made, Purchase Order, Contract signed between the parties, or other form of closing confirmation, the teaching material will be released within 72 working hours (up to 9 days), due to the adaptation of the syllabus and compliance with the Standards Techniques applicable to the scenario expressed by the Contracting Party; as well as other adaptations to the teaching material, carried out by our Multidisciplinary Team for technical language according to the student’s nationality and Technical Operational and Maintenance Instruction Manuals specific to the activities that will be carried out.
Tools Needed for Maintenance
Allen key, 5mm and 6mm;
Small pliers with round tip;
Inner snap ring pliers, 2.3 and 4 mm;
External snap ring pliers, 2 and 3 mm;
Medium screwdriver (1/4” or 5/16”);
1/8” and 3/16” screwdriver;
Wrench 13, 19, 30, 36, and 46 mm;
41e 46mm star wrench;
Backlash gauge (long) 0.4, 0.5 and 0.6 mm;
Preventive Maintenance Tools
Check the functioning of all movements;
Test the brake operation;
Check that the load chain has not been abraded in the joints;
Check oil level. Complement if necessary;
Check chain fastenings, clean and lubricate with ROCOL;
Review the drive elements, connections, weld seams and fixing of the translation car.;
Check the load and suspension hooks for cracks or other damage;
Change the oil (gearbox). Clean the oil outlet screw;
Check the correct adjustment of the sliding coupling (1/3 of the nominal load), if necessary, readjust it;
Check the carriage, especially the wheels and the rolling path; possibility of abrasion;
Change the gearmotor grease;
Change the grease on the drive carriage gear.
Hand tools:
Allen Wrench Set Inch and Millimeter.
Combined Keys from 07 to 19 and 36mm
Screwdrivers and Philips
Cannon Key 07
Digital multimeter
Digital Megometer
Small Bearing Bag.
Parts Subject to Wear
Internal chain guide
Disengagement;
O-Ring Rings;
Copper gasket and retainers;
Chain entry guide;
Sliding brake ring (must not contact oil – min. Adm. thickness 3mm);
Drag gears;
bearings;
Current (measure with caliper, always between 11 links);
Stator (test with 2,500 volts; between ground and coil);
Parts for Preventive Maintenance
Lubricant (ROCOL);
Ball Set for Rotor – 5 mm;
Rotor Roller Set – 5 mm;
Elastic rings for shafts;
Spring washers for screws;
5×45, 16.5×32 and 4×40 cotter pins;
12×36 copper Seal Rings;
Sliding Coupling Ring;
Retainers;
O-ring rings (145×2=> R20 – OR 121 x 2 => R60.
Attention: The Course teaches how to Apply the normative concepts of the standard, which enables you to sign Projects, Reports, Expertise, etc. these are the attributions that the (a) Legally Qualified Professional has with his Class Council, such as CREA.
This course aims to study situations where it will be necessary to apply: Concepts and Calculations according to relevant standards and does not replace the analysis and responsibility on the part of each professional accredited by CREA or other Class Councils in the most varied situations, where makes it imperative to respect the conservation conditions of equipment, periodic checking of instruments, as well as respect for the primary capacity predetermined by the PPE manufacturers, among others based on the corresponding Standards.
Certificate: The Certificate will be issued to each participant who reaches the minimum achievement of 70% (theoretical and practical) as recommended by the Regulatory Standards.
Criteria for Training or Updating Certificates:
Our certificates are numbered and issued in accordance with the Regulatory Standards and applicable devices:
Issue of A.R.T. (Technical Responsibility Note);
Employee’s full name and identity document;
Program content;
Workload; City, place and date of the training;
Name, identification, signature and qualification of instructor(s);
Name, identification and signature of the technical person responsible for the training;
Name and qualification of our Qualified Professional;
Specification of the type of work;
Space for the trainee’s signature;
Information on the Certificate that the participants received an e-book containing teaching material (Handbook, Videos, Rules etc.) presented in the training.
Training Evidence: Edited video, photos, digitized documentation, continuous improvement, instructor opinion: Consult values.
Heads up:
EAD (Distance Learning), Semi-presential The EAD Certificate also known as Online, according to LAW No. 9,394, OF DECEMBER 20, 1996. can be used for: Complementary Activities; company valuations; Public Tenders; University Extension; Extracurricular hours; Improved chances of getting a job; Recruitment processes; Internal promotions; Title Evidence; Doctoral selections; Master’s Selections; Enter other opportunities. A 100% Distance Learning (Distance Learning) or Blended Course that requires a Pedagogical Project is only valid for the Employer, if the SEPRT Ordinance No. 915, of July 30, 2019 – NR 01 – General Provisions of the Special Secretariat of Pension and Work. click here.
The rationale for the Price and Value relationship:
The pricing of any service requires expertise related to the business world and the concept of Value is qualitative, directly linked to the potential for transformation that exists in that content. The service has more value when it has added professional knowledge and secrets and the price is a variable that is a consequence of the value, whose objective is to transmit it in numbers. Thus, the greater the value added to the content, the greater its fair price. Therefore, we do not authorize the use of our Proposals as proof of closing with third parties with a lower price, or of secondary interest, Quality, Safety, Efficiency and Excellence, in every sense, are our values.
Causes of Work Accident:
Lack of alert from the employer;
Lack of employee care;
Even carrying out all the mandatory Training and Occupational Health and Safety Reports in the event of an accident at work, the employer will be subject to processes such as:
Police Inquiry – Civil Police;
Expertise through Instituto Criminalista;
Verification Procedure at the Regional Labor Office;
Public Civil Inquiry before the Public Ministry of labor to verify that other workers are not in danger;
The INSS will question the cause of the accident that could be avoided and refuse to pay the benefit to the employee;
Family members may file a lawsuit in the Labor Court claiming pain and suffering, material damage, dislocation, etc.;
Procedural Tsunami forcing the Employer to generate a Defense Strategy even though it is right;
Although the Labor Delegation Law does not provide that “culpa en vigilando” applies, but only the responsibility to deliver the equipment, however it is worth emphasizing that the Employer is also responsible for overseeing;
When an accident occurs, in addition to destroying all the “good mood” in the relations between employees or also the very serious problem of defending yourself against a series of procedures at the same time, then it is worth investing in this prevention;
The Employee may not carry out activities exposed to risks that could compromise their safety and health, thus the Employer may respond in the criminal and civil spheres.
LAW No. 5.194, OF 24 DEC 1966 – CONFEA:
“Section III
Illegal exercise of profession
Art. 6 – Illegally exercises the profession of engineer, architect or agronomist:
a) the natural or legal person who performs acts or provides services, public or private, reserved for the professionals dealt with in this Law and who do not have registration in the Regional Councils:
b) the professional who undertakes activities outside the attributions listed in his/her registration;
c) the professional who lends his name to persons, firms, organizations or companies performing works and services without his real participation in their work;
d) the professional who, suspended from exercising, continues in activity;
e) the firm, organization or society that, as a legal entity, exercises duties reserved for professionals in Engineering, Architecture and Agronomy, in breach of the provisions of the sole paragraph of Article 8 of this Law.”
Important:
If necessary, the use of Lifting Machines and Equipment is MANDATORY, immediately before the movement, to carry out:
01 – Preparation of the APR (Preliminary Risk Analysis)
02 – Work Permit (PT);
03 – Check EPIs and EPCs;
04 – Check the Machine or Equipment Operational and Maintenance Instruction Manual;
05 – Check the Technical Inspection Report of the Equipment and Anchorage Points with ART;
06 – Maintain Equipped Rescue Team;
07 – Safety meeting on the operation with those involved, contemplating the activities that will be developed, the work process, risks and protection measures, according to risk analysis, contained in a document to be filed containing the legible name and signature of the participants;
a) Visual inspection;
b) Checking the operation of the radio;
c) Confirmation that the signals are known to everyone involved in the operation.
08 – The safety meeting must instruct the entire work team, among others involved in the operation, at least about the following hazards:
a) Impact with external structures;
b) Unexpected movement;
c) fall from height;
d) Other specifics associated with the lift.
Elevator Installation and Maintenance Course
Know More About: Elevator Installation and Maintenance Course
18.9.3 Os vãos de acesso às caixas dos elevadores devem ter fechamento provisório de toda a abertura, constituído de material resistente, travado ou fixado à estrutura, até a colocação definitiva das portas.
18.11.11 As torres dos elevadores devem estar afastadas das redes elétricas ou estar isoladas conforme normas específicas da concessionária local.
18.11.17 É proibido, nos elevadores, o transporte de pessoas juntamente com materiais, exceto quanto ao operador e ao responsável pelo material a ser transportado, desde que isolados da carga por uma barreira física, com altura mínima de 1,8 m (um metro e oitenta centímetros), instalada com dispositivo de intertravamento com duplo canal e ruptura positiva, monitorado por interface de segurança.
18.11.22 Nos elevadores do tipo cremalheira, a altura livre para trabalho após a amarração na última laje concretada ou último pavimento será determinada pelo fabricante, em função do tipo de torre e seus acessórios de amarração.
18.11.23 Nos elevadores do tipo cremalheira, o último elemento da torre do elevador deve ser montado com a régua invertida ou sem cremalheira, de modo a evitar o tracionamento da cabine. Movimentação de materiais.
Fonte: NR 18.
18.9.3 The access spans to the elevator shafts must have provisional closing of the entire opening, made of resistant material, locked or fixed to the structure, until the definitive placement of the doors.
18.11.11 Elevator towers must be far from electrical networks or insulated according to specific regulations of the local concessionaire.
18.11.17 It is prohibited, in elevators, to transport people together with materials, except for the operator and the person responsible for the material to be transported, provided that they are isolated from the load by a physical barrier, with a minimum height of 1.8 m (one meter and eighty centimeters), installed with an interlocking device with double channel and positive rupture, monitored by a safety interface.
18.11.22 In rack-type elevators, the free height for work after mooring on the last concrete slab or last floor will be determined by the manufacturer, depending on the type of tower and its mooring accessories.
18.11.23 In rack-type elevators, the last element of the elevator tower must be mounted with the ruler inverted or without rack, in order to avoid the cabin traction. Material handling.
Source: NR 18.